Made to order in London · Free delivery

STARLEAD Kursi Makan – Italian Royal Crown

Rp 1.298.700

Kursi Makan Kulit Italian Royal Crown Kode : YZ12005 | YZ12006 | YZ12007 | YZ12008 Ukuran : 50 x 53 x 93cm Bahan / Material : Hi Tech Leather + x- Spharical Frame Design + Carboon Steel 1.2mm + Elastic Sponge Warna : Orange – Khaki | Light Grey – Grey | Green – Brown | Cream – Brown Keunggulan Produk : – Material Berkualitas – Daun Kursi & Sandaran Kursi Yang Empuk – Frame Kursi Yang Kuat & Tahan Karat – Tampilan dan Desain yang Menarik Jika paket pengirimannya terjadi kendala ataupun tingkat kepuasan anda merasa kurang, silahkan hubungi…

Color
Remove compare

Material

100% wool bouclé, removable cover

Lead time

8–10 weeks, built to order

Delivery

Free, two people, into the room

Not sure about the colour? We will post you all four swatches, free. Order swatches

Kursi Makan Kulit Italian Royal Crown
Kode : YZ12005 | YZ12006 | YZ12007 | YZ12008
Ukuran : 50 x 53 x 93cm
Bahan / Material : Hi Tech Leather + x- Spharical Frame Design + Carboon Steel 1.2mm + Elastic Sponge
Warna : Orange – Khaki | Light Grey – Grey | Green – Brown | Cream – Brown

Keunggulan Produk :
– Material Berkualitas
– Daun Kursi & Sandaran Kursi Yang Empuk
– Frame Kursi Yang Kuat & Tahan Karat
– Tampilan dan Desain yang Menarik

Jika paket pengirimannya terjadi kendala ataupun tingkat kepuasan anda merasa kurang, silahkan hubungi kami terlebih dahulu dengan melampirkan ***VIDEO UNBOXING*** sebelum memberikan review. Kami akan berusaha meningkatkan layanan dan memberikan kepuasan kepada anda, ini merupakan visi dan misi Starlead.

Weight 34 kg
Dimensions 50 × 53 × 93 cm
Color

Brown-Khaki, Cream-Brown, Green-Brown, Light Grey – Grey

There are no reviews yet.

Be the first to review “STARLEAD Kursi Makan – Italian Royal Crown”

Your email address will not be published. Required fields are marked *

Built after you order it

Beech frame, feather-wrapped cushions, cover cut in one direction so the loops all catch the light the same way. Eight to ten weeks, one workshop, no subcontractors.

How we make them